Expansion of Gurye SWTP, South Korea

The Gurye SWTP treats domestic wastewater and had originally a capacity of 5500 m³/day.
Due to the successful replacement of brush aerators and the reliable operation of FUCHS aerators and mixers in the existing plant,
the operators decided to use OxyStar aerators and TurboStar mixers for the expansion project.
The expansion increased the total capacity to 6500 m³/d. This was done by adding two additional oxidation ditches.
One for aerobic treatment equipped with OxyStar Aerators and one for anoxic treatment with TurboStar Mixers.
After a comprehensive test period the operation of the expansion started May 01, 2024.

Latest News

We use cookies and scripts on our website. Some of them are essential, while others help us to improve this website and your user experience with it.
You have the option to withdraw your consent at any time via the privacy policy. 
Customize. Customize.
Accept All